Simulator test
Grid operating point and scenario states are visible in the server UI.
SIMCERT · SERVER TEST
V2G and DER scenarios in ISO 15118-20 and OCPP 2.1 require broader server-side pre-validation than ordinary charging logs. ARCANIA CSMS connects scenario configuration, execution, results and PDF/CSV reports in one screen.

Grid operating point and scenario states are visible in the server UI.
SimCert is connected with CSMS operation and report flow.
Results can be shared as screen, CSV and PDF evidence.
Formal certification is separate; SimCert prepares development validation evidence.
Scenario definition, ARCANIA execution, OCPP gateway path and report output are connected as one validation flow.
Scenario target is selected.
Server executes the scenario.
OCPP charger/gateway path.
Step-by-step status.
PDF/CSV evidence.